Galliford Try Solar Panel Installation
After a competitive tender process Ecosphere were appointed by the main contractor, Galliford Try.
The system was mounted on an inverted ballasted roof using Renusol mounting tubs directly onto the insulation slab. The mounting tubs were ballasted using the displaced beach, with the modules connecting into an ABB 27.4 kw inverter located in a designated riser space.